Decoration Contract Decoration

Contract for housing decoration


Housing decoration contract, housing decoration contract


First party:


Party B:


After friendly consultations, Party A and Party B have reached agreement on the contract for the renovation and construction of Party A and sign this contract.


1. Party B shall undertake all the construction work of the house decoration, that is to say, the Contractor shall not carry the materials, but Party A shall have the decoration materials, and Party B shall only be responsible for the construction.


Two, contract cost: RMB whole (lowercase 13800 yuan).

In addition, Party A will not pay any cost to Party B.


Three, payment method:


1. Party B will pay RMB per thousand yuan ($100) for Party B's day of construction.


2, after the completion of all decoration works, Party B will pay the progress RMB RMB thousand yuan ($100).


3. After the completion of all decoration works, Party A will pay the balance of RMB in the day after tomorrow.


Four, construction period: the two sides confirm that the construction period of the building is days, and that Party B should complete all the construction tasks within the agreed time limit.


Five, other conventions:


1, Party A is responsible for purchasing decoration materials in time according to the list provided by Party B.


2, Party A should pay in time according to the contract, otherwise it will pay 200 yuan / day for breach of contract.


3, Party B shall prepare its own tools, hire personnel, and be responsible for the safety of the construction itself, strictly in accordance with the drawings provided by Party A and Party A's requirements, so as to ensure the quality of the project. If the quality unqualified behavior is found during the construction process, it will cause rework, so the loss of the decoration materials and the loss of labor will be borne by Party B.


4, Party B shall not waste or misuse the decoration materials of Party A, otherwise, it will be punished according to 500 yuan / time, and compensation for Party A shall be compensated.


5, Party B shall complete all construction tasks within the time limit stipulated in the contract, and shall be punished according to 200 yuan per day for each extension.

Party B shall not be liable for breach of contract if Party A fails to pay in time, the material of the decoration is delayed or the content of the new construction is delayed.


6, the repair period of the house is two years, and Party B shall be responsible for free maintenance of Party A in time of warranty.


Six. This contract is made in two copies. Each party holds one copy and the two parties sign it into force.


Party A (signature): Party B (signature):


Time: time:


Contents of housing renovation contract


(1) living room production and painting


1. Door entry.


2, shoe cabinet;


3, the entrance;


4, wine cabinet;


5. TV cabinet;


6, kitchen door sets;


7, television background wall;


8. Ceiling of TV background wall.


10, the living room and balcony door sliding door;


11, bathroom doorway aisle ceiling.


(two) master bedroom


1, wardrobe;


2. Double side door cover and door panel.


3, aisle ceiling.


(three) supine manufacture


1. Double side door cover and door panel.


2, wardrobe.


(four) children's room


1, two door double doors, door panels;


2, wardrobe;


3, computer desk and bookshelf;


4, tatami bed;


(six) toilet


1, ceiling;


2 change to sink water bay.


4. Floor tile and wall tiles.


(seven) kitchen


1. Stick floor tiles and wall tiles.


2, ceiling.


(eight) two life balcony


1. Floor tile;


2, making, hanging cabinet.


(nine) living room balcony


1, desk, bookcase;


(ten) comprehensive category


1, living room,

Bedroom

Living room balcony top and

metope

Putty 3 times, wall paint 2 times;


2.

Kitchen

The water pipe of the toilet is supplementing and modifying.


3, all circuit pformation;


4. Leveling all the ground.


5, toilet wall waterproof treatment;


6, wardrobe, bookcase moisture-proof treatment;


7, lamps and lanterns, sanitary ware installation;


8, the windows are paved with marble.


9, bathroom, kitchen doorway laying threshold stone;


10, living room balcony, life balcony stick skirting line;


11, pack all water pipes and lampblack pipes.


(eleven), others:


1, decoration materials handling (from the main entrance to the house);


2, decoration sanitation, garbage cleaning to the garbage station;


3, decoration management fees, garbage clearing fees shall be the responsibility of Party A.

  • Related reading

Contract For Development Of Barren Hills

Contract template
|
2010/11/4 9:56:00
54

Hotel Contract

Contract template
|
2010/11/3 13:36:00
141

Hotel Contract Agreement

Contract template
|
2010/11/2 9:44:00
464

Model Of Enterprise Contract

Contract template
|
2010/11/1 17:35:00
355

Contract For Subcontracting (Rental) Of Rural Land Contractual Management Right

Contract template
|
2010/10/30 10:12:00
79
Read the next article

CONVERSE Converse Canvas Shoes Stars Love Casual Shoes.