Home >

Calculation Of Clothing Line And Cost Control

2010/9/20 18:21:00 318

Garment Line Management

In the process of garment production, the cost of wire consumption is increasingly being affected.

Administration

The importance of Fang.

Because the profits are very thin now, the details cost is also emphasized.

The amount of clothing used for a garment is less than a few cents and more than a few cents.

For a fifty thousand piece list, the difference in line volume is 0.05 yuan / piece, and the wages of a general manager will be saved after a single entry.

Current

Garment line

Industry is already a time of reckoning.


To save line cost, the first step is to calculate the line consumption of a single piece of clothing.

Stock

Secondly, we must strictly control the line consumption in the actual production process so as to reduce wastage.

Here's the first question:


Flat car usage: 1:3 bottom ratio: 1:1


Three line dosage: 1:13.


Four line dosage: 1:16.


Single needle at chain bottom: 1:7.5


1/4 three line car usage: 1:16 bottom surface ratio: 3:2


1/8 three line car usage: 1:14 bottom surface ratio: 1:1


Three needle five line shrimp shuttle dosage: 1:23


Three line density: 1:14, depending on the density.


For each seam that needs to be broken, a seam head plus 12cm length.


Without a broken line, a seam head plus 6cm length;


Under the condition of thick fabric, the above examples should be increased appropriately.


After each place is added to the seam, the proportion is then multiplied and the total loss is increased by 20%.


In the actual production process, line control is very important, and the wrong method will result in waste.


The most important link is the strict control of warehouses. In actual production, it is often a sentence of the production team: there is no line.

The warehouse has to provide the line unconditionally, and then the purchase will have to be filled. After the order is finished, the workshop is covered with lines everywhere.


So how to control it depends on the specific production and operation of the factory.

For example: cut out the bed, fill in the goods list, produce the voucher, and look at the warehouse.

It is impossible to know the quantity blindly.

Sometimes a small divider is used because it is large.

There are also ways to strictly enforce the line changing system when changing colors.


Other wired quality control, quantity control and so on.

  • Related reading

Domestic And Foreign Standards And Regulations Concerning Children'S Wear Safety

Industry standard
|
2010/9/11 16:17:00
61

Review The Development Of Kitchen And Bathroom Industry

Industry standard
|
2010/9/11 9:04:00
108

纺机业考核标准:淘汰落后提升产业能

Industry standard
|
2010/9/9 18:18:00
45

Unveil The White Paper On The Quality Of Down Garments

Industry standard
|
2010/9/9 16:13:00
76

Order Of The National Development And Reform Commission Of The People'S Republic Of China

Industry standard
|
2010/9/9 9:19:00
86
Read the next article

Patent: Far Infrared Health Panty Hose

A trouser waist is connected with the trousers body, the trousers body is divided into the trousers body and the outer trousers body, the underwear body is connected with the tights and is made of silk fabrics, and the outer trousers body is made of far-infrared fabric from the waist waist to the knee part, and the crotch part is made of pure cotton fabric into a net shaped crotch. When women wear far infrared health panty hose, it not only has good warmth retention and health care functions.